Benvenuti in apac build equipment

Galleria del progetto EDGE PROTECTION SYSTEM

Progetto della Affin Bank in Malesia

Project Time: In the Year 2018

Project site: Kuala Lumpur, Malaysia

Contractor: IJM CONSTRUCTION SDN

IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).

Reference Product: Double-height Edge Protection System

When the construction site is relatively high or the distance between concrete slabs is large, a double edge protection system can be used to provide a wider range of protection.

Main Components:

  1. Socket Base
  2. Safedge Mesh Barrier: 2.6m/1.3m
  3. Safedge Post: 1.2m
  4. Extension Post: 1.8m

The system has the following benefits:

  • Simple to install: no need for specialist skills. 
  • Strong and Durable: strictly complies with the standards EN13374:2013, OSHA 1926.502, AS/NZS 4994.
  • More resistant to corrosion and have a longer service life: galvanized steel plus powder coated surface treatment and socket bases are all hot dipped surface treatments. 

Project overview:

scarica il nostro catalogo

Want to know more specifications about our edge protection system? Let’s download our latest catalog!

altre domande?

If you still have questions about our products or want to know more information about our projects, please contact us now, our expert will solve all your problems!

it_ITItalian

CONTATTACI