Benvenuti in apac build equipment

Galleria del progetto EDGE PROTECTION SYSTEM

Progetto della Affin Bank in Malesia

Tempo del progetto: In the Year 2018

Sito del progetto: Kuala Lumpur, Malaysia

Contraente: IJM CONSTRUCTION SDN

IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).

Prodotto di riferimento: Double-height Edge Protection System

When the construction site is relatively high or the distance between concrete slabs is large, a double edge protection system can be used to provide a wider range of protection.

Componenti principali:

  1. Base della presa
  2. Safedge Mesh Barrier: 2.6m/1.3m
  3. Safedge Post: 1.2m
  4. Extension Post: 1.8m

Il sistema presenta i seguenti vantaggi:

  • Simple to install: no need for specialist skills. 
  • Strong and Durable: strictly complies with the standards EN13374:2013, OSHA 1926.502, AS/NZS 4994.
  • More resistant to corrosion and have a longer service life: galvanized steel plus powder coated surface treatment and socket bases are all hot dipped surface treatments. 

Project overview:

scarica il nostro catalogo

Vuoi conoscere maggiori specifiche sul nostro sistema di protezione dei bordi? Scarichiamo il nostro ultimo catalogo!

altre domande?

Se hai ancora domande sui nostri prodotti o vuoi avere maggiori informazioni sui nostri progetti, contattaci subito, il nostro esperto risolverà tutti i tuoi problemi!

it_ITItalian

CONTATTACI