Hallo, ich bin Pieter Zhang, Gründer von APAC. Ich bin seit 14 Jahren im Geschäft mit Baustellensicherheitsprodukten tätig und der Zweck dieses Artikels besteht darin, mein Wissen über Baustellensicherheitsprodukte aus der Sicht eines chinesischen Lieferanten mit Ihnen zu teilen.

 Even a lot of companies in China supply the Temporary fence to Australia and New Zealand but most of them have no idea about AS 4687: 2007 TEMPORARY FENCING AND HOARDINGS.

 APAC has enough knowledge of this standard and APAC’s Temporary fence is strictly conforms to AS 4687- 2007

Detail of test results.

1. Simulated Climbing Test

 APAC Temporary fence panel can successfully support a 65kg test load without overturning. Strictly comply with the requirement on AS 4687-2007 Clause 4.2

2. Impact Test

 APAC single temporary fence panel assembled with the addition of a single, interlocking back brace can bear an impact collision of 150 joules, without visible sign of cracking, no overturning and the dynamic deflection is less than 300mm. The results meet the requirements on AS 4687-2007 TEMPORARY FENCING AND HOARDINGS Clause 4.3.

3. Infill Aperture Test

3.1 The Temporary fencing infill aperture horizontal width was measured to be 60mm, less than the specified maximum of 75mm. A test block measuring 76mm x 76mm could not be passed through the rectangular-shaped mesh infill. Conform to AS 4687-2007 TEMPORARY FENCING AND HOARDINGS Clause 4.4.2

3.2 Temporary Fence Infill downward load test resulted in a deflection of 18mm in accordance with Figure 4.4.3(b), and in a deflection of 2mm in accordance with figure 4.4.3(c). Less than the specified permissible maximum of 35mm. Meet the requirements on AS 4687-2007 Clause 4.4.3 for the temporary fencing and hoardings.

4. Wind Force Overturning Test

4.1 A APAC Temporary Fence panel fitted with footings, one interlocking back brace and a single foot block can bear the wind speed of 24m/s, meets the minimum wind speed requirement for Region A-D (AS 4687-2007‬).

4.2 Two (2) APAC Temporary Fence panels fitted with footings, one interlocking back brace, and one-foot block can bear a wind speed of 18m/s, meet the minimum wind speed requirement for Region A-B(AS 4687-2007‬).

4.3 Two (2) APAC Temporary Fence panels fitted with footings, one interlocking back brace, and two-foot blocks can bear a wind speed of 24m/s, meet the minimum wind speed requirement for Region A-D(AS 4687-2007‬).

For more detail of the test results, please kindly check the test report we did in SGS according to the standard AS 4687: 2007.

Down load test report of AS 4687 Temporary Fencing
auf facebook.
Þjórsárden
LinkedIn

Letzter Beitrag

quickstage-scaffold-application

3 Haupttypen von Gerüsttreppen

Einleitung Treppen sind wichtig für den sicheren Zugang zu hohen Arbeitsbereichen im Bauwesen. Sie helfen Arbeitern, sich einfach und sicher zwischen den Ebenen zu bewegen. Die Kenntnis der verschiedenen

Mehr lesen "

Kostenlose Beratung

de_DEGerman

KONTAKTIEREN SIE UNS