Välkommen till apac bygga utrustning

EDGE PROTECTION SYSTEM projektgalleri

Affin Bank-projekt i Malaysia

Projekttid: In the Year 2018

Projektets webbplats: Kuala Lumpur, Malaysia

Entreprenör: IJM CONSTRUCTION SDN

IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).

Referensprodukt: Double-height Edge Protection System

When the construction site is relatively high or the distance between concrete slabs is large, a double edge protection system can be used to provide a wider range of protection.

Huvudkomponenter:

  1. Sockel Bas
  2. Safedge Mesh Barrier: 2.6m/1.3m
  3. Safedge Post: 1.2m
  4. Extension Post: 1.8m

Systemet har följande fördelar:

  • Simple to install: no need for specialist skills. 
  • Strong and Durable: strictly complies with the standards EN13374:2013, OSHA 1926.502, AS/NZS 4994.
  • More resistant to corrosion and have a longer service life: galvanized steel plus powder coated surface treatment and socket bases are all hot dipped surface treatments. 

Project overview:

3D-display
skräddarsydd 3d-design

ladda ner vår katalog

Vill du veta mer specifikationer om vårt kantskyddssystem? Låt oss ladda ner vår senaste katalog!

mer fråga?

Om du fortfarande har frågor om våra produkter eller vill veta mer information om våra projekt, vänligen kontakta oss nu, vår expert löser alla dina problem!

sv_SESwedish

KONTAKTA OSS