Välkommen till apac bygga utrustning
EDGE PROTECTION SYSTEM projektgalleri
Affin Bank-projekt i Malaysia
Projekttid: In the Year 2018
Projektets webbplats: Kuala Lumpur, Malaysia
Entreprenör: IJM CONSTRUCTION SDN
IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).
Referensprodukt: Double-height Edge Protection System
When the construction site is relatively high or the distance between concrete slabs is large, a double edge protection system can be used to provide a wider range of protection.
Huvudkomponenter:
- Sockel Bas
- Safedge Mesh Barrier: 2.6m/1.3m
- Safedge Post: 1.2m
- Extension Post: 1.8m
Systemet har följande fördelar:
- Simple to install: no need for specialist skills.
- Strong and Durable: strictly complies with the standards EN13374:2013, OSHA 1926.502, AS/NZS 4994.
- More resistant to corrosion and have a longer service life: galvanized steel plus powder coated surface treatment and socket bases are all hot dipped surface treatments.
Project overview:
![](https://apacsafety.com/wp-content/uploads/2022/06/Affin-Bank-new-building-763x1024.jpg)
![](https://apacsafety.com/wp-content/uploads/2022/06/edge-protection-project-ma.jpg)