Welcome To apac build equipment

EDGE PROTECTION SYSTEM project gallery

Affin Bank project in Malaysia

Project Time: In the Year 2018

Project site: Kuala Lumpur, Malaysia

Contractor: IJM CONSTRUCTION SDN

IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).

Reference Product: Double-height Edge Protection System

When the construction site is relatively high or the distance between concrete slabs is large, a double edge protection system can be used to provide a wider range of protection.

Main Components:

  1. Socket Base
  2. Safedge Mesh Barrier: 2.6m/1.3m
  3. Safedge Post: 1.2m
  4. Extension Post: 1.8m

The system has the following benefits:

  • Simple to install: no need for specialist skills. 
  • Strong and Durable: strictly complies with the standards EN13374:2013, OSHA 1926.502, AS/NZS 4994.
  • More resistant to corrosion and have a longer service life: galvanized steel plus powder coated surface treatment and socket bases are all hot dipped surface treatments. 

Project overview:

3D display
customized 3d design

download our catalog

Want to know more specifications about our edge protection system? Let’s download our latest catalog!

more question?

If you still have questions about our products or want to know more information about our projects, please contact us now, our expert will solve all your problems!

CONTACT US